Gravel Calculator
Enter the area's length and width and the depth of gravel to get the volume in cubic feet and cubic yards, the approximate weight in tons, and the number of 0.5 cu ft bags.
Volume
50 cu ft
Gravel Needed
1.85 cu yd
Approximate Weight
2.59 tons
0.5 cu ft Bags
100 bags
How it works
The area to be covered is treated as a rectangle, so the volume is length × width × depth. Length and width are in feet and depth is in inches, so the depth is divided by 12 first. That gives cubic feet; dividing by 27 converts to cubic yards, which is how bulk gravel is sold.
Suppliers often quote by weight rather than volume, so the volume is also converted to tons using a typical density for the material you chose: about 1.4 tons per cubic yard for gravel and pea gravel, and 1.5 for crushed stone. These are averages for dry, loose material; the figure for what your supplier actually delivers can differ, so treat the tons as a guide and the cubic yards as the firmer number.
For small jobs the volume is also given as 0.5 cu ft bags, the usual retail size, rounded up to whole bags. Once the count runs into the dozens, bulk delivery is almost always cheaper.
Formula
cubic feet = length × width × (depth ÷ 12) cubic yards = cubic feet ÷ 27 tons = cubic yards × density bags = ⌈ cubic feet ÷ 0.5 ⌉ density: gravel ≈ 1.4, crushed stone ≈ 1.5, pea gravel ≈ 1.4 tons per cu yd
Example
A 20 ft × 10 ft driveway topped with 3 in of gravel needs 20 × 10 × 3⁄12 = 50 cu ft, which is 50 ÷ 27 = 1.85 cu yd. At about 1.4 tons per cubic yard that is roughly 2.59 tons.
In 0.5 cu ft bags it would be 100 bags, which is why bulk delivery is the usual choice at this size. Choosing crushed stone at 1.5 tons per cubic yard instead raises the weight to about 2.78 tons; the volume and bag count do not change.
Assumptions and limitations
- The area is a rectangle covered to a uniform depth. Split an irregular area into rectangles and add the results.
- Densities are typical supplier figures for dry, loose material and are approximate. Wet material, the amount of fines and the type of stone all change the weight. Ask the supplier for the density of what they will deliver.
- Gravel settles and compacts after it is laid. If the final compacted depth matters, for example under a slab or paver base, allow extra.
- No waste allowance is applied. Add 5–10% if the sub-grade is uneven or you want some spare.
- Bulk suppliers sell by the cubic yard or the ton, often with a minimum load.
Frequently asked questions
Should I order by the yard or by the ton?
Order in whatever unit the supplier prices in, but check it against the other. The calculator gives both: cubic yards is the volume you measured and is the firmer figure, while tons depends on an assumed density. If the supplier's tonnage for your yards is far from the figure here, their material is heavier or lighter than the typical value and their number is the one to trust.
How deep should the gravel be?
A path or decorative top layer is usually 2–3 in. A driveway normally gets 4–6 in of compacted crushed stone, often laid in two or three lifts. A base under a slab or pavers is typically 4 in compacted. Deeper layers on soft ground need a geotextile fabric underneath to stop the stone sinking.