Daily Interest Calculator

A $200,000 loan at 6.5% builds up $35.62 of interest a day. Paid off 19 days after interest was last paid, it owes $676.71 of interest, for a payoff of $200,676.71.

Last reviewed

Your interest and payoff

Interest per day

$35.62

Interest for 19 days

$676.71

Payoff on Nov 20

$200,676.71

Your loan builds up $35.62 of interest a day, so 19 days to November 20, 2026 come to $676.71 and the payoff is $200,676.71.

If your statement multiplies the rounded per diem by the days, the interest is $676.78, $0.07 more.

On a 360-day year the same days cost $686.11, $9.40 more.

Waiting until December 1, 2026, the first of the next month, would add $391.78.

For interest over years, not days, use the simple interest calculator. For each monthly payment, use the loan amortization calculator. Each opens with your numbers.

Your loan and dates

Your loan
The principal on your statement, not the payoff amount or the amount you first borrowed. $200,000 is an example.
The note rate, not the APR. On a credit card, use the APR for that balance. 6.5% is an example, not a market rate.
Your dates
The date your statement says interest is paid to, such as the first of the month.
The day your money reaches the lender, not the day you send it.
How your lender counts
Your note or statement names it, such as 365/360 or Actual/360. If it does not say, start with 365.
Up to the payoff date, November 1 to 20 is 19 days; through it, 20. To tell which your statement uses, find its interest in the table of day counts.
Your payoff statement
Fees the statement lists besides the principal and interest, ones you have been charged and have not yet paid. Leave out late fees already in the balance.
Worked sheet for Daily interest and payoff: how the payoff amount of $200,676.71 is worked out, in 5 steps.Daily interest and payoffper day = balance × rate ÷ days in the yearinterest = balance × rate × days ÷ days in the yearpayoff = balance + interest + feesper day = $200,000.00 × 6.5% ÷ 365 ≈ $35.6164days = Nov 20, 2026 − Nov 1, 2026 = 19interest = $200,000.00 × 6.5% × 19 ÷ 365 ≈ $676.71statement way = $35.62 × 19 = $676.78payoff = $200,000.00 + $676.71 =$200,676.71
  1. per day = $200,000.00 × 6.5% ÷ 365 ≈ $35.6164
  2. days = Nov 20, 2026 − Nov 1, 2026 = 19
  3. interest = $200,000.00 × 6.5% × 19 ÷ 365 ≈ $676.71
  4. statement way = $35.62 × 19 = $676.78
  5. payoff = $200,000.00 + $676.71 = $200,676.71
How the $200,676.71 payoff is worked out

Your payoff, day by day

Payoff dateDays of interestInterestPayoff
Sun, Nov 1, 2026paid-to date0$0.00$200,000.00
Mon, Nov 2, 20261$35.62$200,035.62
Tue, Nov 3, 20262$71.23$200,071.23
Wed, Nov 4, 20263$106.85$200,106.85
Thu, Nov 5, 20264$142.47$200,142.47
Fri, Nov 6, 20265$178.08$200,178.08
Sat, Nov 7, 20266$213.70$200,213.70
Sun, Nov 8, 20267$249.32$200,249.32
Mon, Nov 9, 20268$284.93$200,284.93
Tue, Nov 10, 20269$320.55$200,320.55
Wed, Nov 11, 202610$356.16$200,356.16
Thu, Nov 12, 202611$391.78$200,391.78
Fri, Nov 13, 202612$427.40$200,427.40
Sat, Nov 14, 202613$463.01$200,463.01
Sun, Nov 15, 202614$498.63$200,498.63
Mon, Nov 16, 202615$534.25$200,534.25
Tue, Nov 17, 202616$569.86$200,569.86
Wed, Nov 18, 202617$605.48$200,605.48
Thu, Nov 19, 202618$641.10$200,641.10
Fri, Nov 20, 2026your payoff date19$676.71$200,676.71
Sat, Nov 21, 202620$712.33$200,712.33
Sun, Nov 22, 202621$747.95$200,747.95
Mon, Nov 23, 202622$783.56$200,783.56
Tue, Nov 24, 202623$819.18$200,819.18
Wed, Nov 25, 202624$854.79$200,854.79
Thu, Nov 26, 202625$890.41$200,890.41
Fri, Nov 27, 202626$926.03$200,926.03
Sat, Nov 28, 202627$961.64$200,961.64
Sun, Nov 29, 202628$997.26$200,997.26
Mon, Nov 30, 202629$1,032.88$201,032.88
Tue, Dec 1, 202630$1,068.49$201,068.49

Each day adds $35.61 or $35.62 of interest, as each total is rounded to the cent. If your money misses Friday, November 20, and arrives Monday, November 23, it costs $106.85 more.

The same dates under each day count

Day countDaysInterest per dayInterestChange from yours
Actual/365, up to the payoff dateyour count19$35.62$676.71$0.00
Actual/365, through the payoff date20$35.62$712.33$35.62
Actual/360, up to the payoff date19$36.11$686.11$9.40
Actual/360, through the payoff date20$36.11$722.22$45.51
Actual/Actual, up to the payoff date19$35.62$676.71$0.00
Actual/Actual, through the payoff date20$35.62$712.33$35.62
30/360, up to the payoff date19$36.11$686.11$9.40
30/360, through the payoff date20$36.11$722.22$45.51

On these dates the day counts give from $676.71 to $722.22 of interest, $45.51 apart. Counting both dates adds $35.62 on your day count, and a 360-day year adds $9.40 to a 365-day one.

A year of months on your loan

MonthDaysInterest by the dayA twelfth of the yearDifference
December 202631$1,104.11$1,083.33$20.78
January 202731$1,104.11$1,083.33$20.78
February 202728$997.26$1,083.33-$86.07
March 202731$1,104.11$1,083.33$20.78
April 202730$1,068.49$1,083.33-$14.84
May 202731$1,104.11$1,083.33$20.78
June 202730$1,068.49$1,083.33-$14.84
July 202731$1,104.11$1,083.33$20.78
August 202731$1,104.11$1,083.33$20.78
September 202730$1,068.49$1,083.33-$14.84
October 202731$1,104.11$1,083.33$20.78
November 202730$1,068.49$1,083.33-$14.84

February 2027 costs $86.07 less and each 31-day month $20.78 more than a loan that charges a twelfth of the year's interest, $1,083.33. Over these 12 months the totals are $12,999.99 by the day and $12,999.96 by the month.

How daily interest works

Daily interest, also called per diem interest, is one day's share of a year's interest. Per diem is Latin for per day. Multiply your balance by the yearly rate, then divide by the days in your lender's year. On $200,000 at 6.5%, a year's interest is $13,000, so one day of a 365-day year is $35.62. The interest you owe at payoff is that daily amount times the days since interest was last paid.

Why a 360-day year costs more

A 360-day year splits the same $13,000 into fewer days, so each day costs 49 cents more, $36.11. But the calendar still has 365 days, and you pay interest on each of them. On a 365-day year that works out to a rate of 6.5903%, or $180.56 more a year on this loan. Notes call this 365/360 or Actual/360. The official commentary to Regulation Z, comment 17(c)(3)-1.ii, does not let creditors ignore "the effects of applying 1/360 of an annual rate to 365 days" when they disclose the cost of credit.

Why a long month costs more than a short one

When interest is figured by the day, a 31-day month costs more than February. On this loan a 31-day month costs $1,104.11 and February 2027 costs $997.26. A loan that charges a twelfth of the yearly rate charges $1,083.33 every month instead. Over a year that is not a leap year, the two ways end 3 cents apart: $12,999.99 by the day and $12,999.96 by the month.

Why your statement can differ by a few cents

Your statement may print the per diem rounded to the cent and multiply that by the days. Here 19 times $35.62 is $676.78, 7 cents more than the $676.71 worked from the exact daily amount. Each day's rounding is at most half a cent, but on a small balance it shows. On $1,000 at 10% for 75 days, the exact interest is $20.55, while a per diem rounded to 27 cents gives $20.25.

Video walkthrough

A 3-minute walkthrough of what a day of interest costs on a loan, and how the days and the day count change a payoff.

Daily Interest Calculator: What Your Loan Costs Each Day
Read the transcript

What a day of interest costs

0:00 How much interest does your loan cost each day?

0:03 On a $200,000 balance at 6.5% a year, it costs about $36 a day.

0:11 Lenders call that daily amount the per diem, which is Latin for per day.

0:16 It's the figure a payoff statement is built on.

0:19 To find it, multiply the balance by the yearly rate.

0:23 Then divide by the days in your lender's year, 365 here.

Which days count

0:29 Next, count the days.

0:31 Your statement says interest is paid to a date, here November 1.

0:35 Pay off on November 20, and that's 19 days of interest.

0:40 Multiply the per diem by those days, and the interest comes to about $680.

0:47 Add the balance, and you'd pay about $200,700 that day.

0:52 A statement may count the payoff day as well.

0:55 That's one more day, 20 in all, and about $710 of interest.

1:01 The CFPB's answer on payoff amounts says a payoff amount includes any interest due through the day you intend to pay off.

1:10 So check which way your statement counts.

Every day you wait

1:13 On this loan, each day after the payoff date adds another day's interest.

1:18 Weekends count too.

1:20 So if your money misses Friday and arrives on Monday, it costs about $107 more.

1:27 That's 3 more days of interest.

1:29 Wait until the first of the next month, and it adds about $390.

1:35 So make sure your money arrives by the date on your statement.

How your lender counts the year

1:39 Your note also says how many days its year has.

1:43 A loan may count 365, or divide by 360.

1:48 With fewer days, each one costs a bit more, but the calendar still has 365.

1:55 Here that costs about $9 more.

1:58 This table works out your dates under each day count, up to the payoff date or through it.

2:04 The costliest is about $46 more than yours.

2:08 Months differ too.

2:10 When interest builds by the day, a long month costs about $1,100, and February about $1,000.

Match your payoff statement

2:19 When your payoff statement comes, compare its per diem and its days with yours.

2:24 If its interest is a few cents off, it may round the daily amount first, and then multiply.

2:31 And if a gap is still there, look for a fee, or a payment the statement hasn't counted yet.

Try your own loan

2:37 To try your own loan, enter its balance and rate.

2:41 Say $30,000 is left on a car loan at about 7.5% a year.

2:47 The per diem falls to about $6.

2:50 Then set your dates, and choose how your lender counts the year.

2:54 Each table downloads as a CSV file, and Copy link gives you an address that opens with your numbers.

3:02 So find your per diem, count the days, and ask how your lender counts the year.

3:07 Then work out your own payoff at fastcalc.us.

Daily interest formulas

interest per day = balance × annual rate ÷ days in the lender's year (365 or 360; 366 for a leap year on Actual/Actual)
days = payoff date − interest paid-to date, + 1 when both dates count
30/360 days = 360 × years + 30 × months + (D2 − D1), where D1 is the paid-to day and D2 the payoff day; a D1 of 31 becomes 30, and a D2 of 31 becomes 30 only when D1 is 30 or 31
Actual/Actual interest = balance × rate × (days in other years ÷ 365 + days in leap years ÷ 366)
interest = balance × annual rate × days ÷ days in the year, rounded to the cent once
payoff = balance + interest + fees
rate on a 365-day year = rate × 365 ÷ 360, for a 360-day count

Worked examples

Exact and ordinary interest. Find the exact interest on a loan of $32,000 at 9% for 30 days. Exact interest uses a 365-day year: $32,000 × 9% × 30 ÷ 365 is $236.71. Ordinary interest uses a 360-day year and gives $240.00, $3.29 more. That is the same as a rate of 9.125% on a 365-day year.

Exact time and approximate time. Exact time counts the real days, and approximate time counts every month as 30 days. From January 31 to April 30, 2026, exact time is 89 days and approximate time is 90. On the same $32,000 at 9%, exact time with ordinary interest, called the Banker's rule, gives $712.00. Exact time with exact interest gives $702.25.

A payoff that crosses into a leap year. An Actual/Actual note divides each day of 2028 by 366. From December 15, 2027 to January 15, 2028, 17 days fall in 2027 and 14 in 2028. On $200,000 at 6.5% the interest is $1,102.75, which is $1.36 less than on a 365-day year.

Check your payoff statement

A payoff statement lists your principal, the interest from the date it was last paid to a good-through date, the per diem and any fees. The CFPB's answer on payoff amounts says your payoff amount "includes the payment of any interest due through the day you intend to pay off your loan." For a loan secured by your home, Regulation Z, 12 CFR 1026.36(c)(3), says the statement "shall be sent within a reasonable time, but in no case more than seven business days" after you ask for it in writing.

To match a statement, enter its principal, rate and dates, then compare its interest with the table of day counts above. On the default inputs, $676.71 for 19 days means a 365-day year and the exact daily amount. $676.78 means the per diem was rounded first. $686.11 means a 360-day year, and $712.33 means both dates were counted. The CFPB's wording, interest due "through the day" you pay off, is the Through option. Up to is the default because it counts the days between the two dates, as a date difference does. To tell which yours uses, find its interest in the table, on an Up to row or a Through row. A gap that stays after all of these points to a fee, or to a payment the statement has not applied yet.

On an FHA loan closed on or after January 21, 2015, HUD's rule at 24 CFR 203.558(a) says monthly interest must be figured on the balance "as of the date the prepayment is received, and not as of the next installment due date." Under 24 CFR 203.558(b)(2), an FHA loan insured on or after August 2, 1985 but closed before January 21, 2015 may charge interest to the next due date, the first of the month. It may do so only if the servicer tells you, in a form HUD approves, when you ask about paying off. Paying on November 20 could then cost 11 more days, $391.78. One insured before August 2, 1985 may charge to the first of the month after a 30-day notice period ends, under 24 CFR 203.558(b)(1).

When daily interest works differently

If your loan counts 30-day months

A 30/360 note or bond counts every month as 30 days. From January 31 to March 1, 2026 that counts 31 days, though only 29 pass. On $200,000 at 6.5% it charges $1,119.44, which is $86.56 more than an Actual/365 count. Up to the same date a year later, 30/360 counts 360 days and charges exactly a year's interest, but it runs ahead around February and behind in 31-day months. For a bond's accrued interest, use the bond accrued interest calculator.

If it is a car or personal loan

Most car loans use simple interest, figured on the balance by the day or by the month. The CFPB's answer on simple and precomputed interest says the interest you pay each month "is calculated based on your actual outstanding balance on the day your payment is due." Say $30,000 is left at 7.54%, the Federal Reserve's August 2026 rate for a 60-month new-car loan at commercial banks. It costs $6.20 a day, so a payment 10 days late puts $61.97 more toward interest and that much less toward your balance. The auto loan calculator shows the whole loan.

If it is a credit card

A card statement shows your APR and the balance it charges interest on. Regulation Z, 12 CFR 1026.7(b)(5), names that balance the Balance Subject to Interest Rate. The CFPB's answer on card interest says many card companies figure the interest you owe daily, based on your average daily balance. Its answer on the daily periodic rate adds that each day's interest "is then added to the previous day’s balance", so it compounds daily.

Take 22.36%, the Federal Reserve's August 2026 rate on bank card accounts that were charged interest. A $3,000 average balance then costs $55.13 over a 30-day cycle as simple daily interest. Added to the balance each day, it costs $55.63, and $56.41 if your issuer divides by 360. The credit card interest calculator works out a cycle.

If it is savings or a CD

Savings work the other way round. Regulation DD, 12 CFR 1030.7(a)(1), says a bank "shall calculate interest by use of a daily rate of at least 1/365 of the interest rate," or 1/366 in a leap year. At 4% compounded daily, for example, $10,000 earns $408.08 in a year, an annual percentage yield (APY) of 4.08%. In Appendix A to 12 CFR part 1030, Regulation DD's sample of a stepped six-month CD earns $26.68, a 5.39% APY, and daily compounding gives the same cents.

Its two-year sample is $133.13. Compounding straight through the two years gives $133.14, while rounding each year's interest to the cent, $61.83 and then $71.30, gives the sample's figure. The Truth in Savings APY calculator and the CD calculator work out a deposit's yield.

If the federal government pays an invoice late

When a federal agency pays a business invoice late, it owes the vendor interest. For a payment less than 31 days late, the Bureau of the Fiscal Service's page Prompt Payment: Simple Daily Interest gives the formula P(r/360*d), a 360-day year. Its example: an invoice of $1,500 paid 10 days late at 6.625% "would be calculated as follows: $1,500 (.066/360*10) = $2.75." The example rounds the rate to .066; at the full 6.625% the interest is $2.76. The federal prompt payment interest calculator works out any invoice.

Assumptions and limits

  • The balance and the rate stay the same from the paid-to date to the payoff date. A payment in between lowers the balance, so work each part of the period on its own.
  • Interest is simple: it is not added to the balance before the payoff. Cards and savings that compound daily are covered above.
  • Days are whole calendar days. On 30/360 a paid-to date on the 31st counts as the 30th. A payoff date on the 31st counts as the 30th only when the paid-to date is the 30th or 31st. Other forms of 30/360 treat the 31st or the end of February differently.
  • The payoff is the principal, the interest and the fees you enter. A statement may also add other fees you have been charged and have not yet paid, such as late charges, or a prepayment penalty.
  • Interest is rounded to the cent once, at the end. Your servicer may round the per diem first, as shown above.
  • The $200,000 balance, the 6.5% rate and the November 2026 dates are an example, not today's market. The car and card rates are the Federal Reserve's for August 2026.
  • The form takes balances up to $10,000,000, rates up to 50% and payoff dates up to 10 years after the paid-to date.

These figures are estimates for learning and planning, not financial, tax, legal or investment advice. Terms of use.

What to do before you pay off

Ask your servicer in writing for a payoff statement for the day you plan to pay. Check its per diem against the one here, $35.62 on the default inputs, and its days with the date difference calculator.

Make sure your money arrives by the good-through date. On the default inputs each day after it adds another day's interest, and waiting from November 20 to December 1 adds $391.78. If you plan to pay the loan down rather than off, the mortgage payoff calculator shows how extra payments shorten it.

On a car or personal loan whose simple interest is figured by the day, pay on or before the due date. Paying 7 days early on $30,000 at 7.54% on a 365-day year moves $43.38 from interest to your balance. The loan extra payment calculator shows what steady extra payments do.

If a loan divides its rate by 360, compare offers by what that rate comes to over a full calendar year. A 7.2% rate charged that way comes to 7.3%. The loan amortization calculator shows the monthly payment at that rate.

Frequently asked questions

How do I calculate daily interest?

Multiply your balance by the annual rate and divide by 365, or by 360 if your note says so. On $15,000 at 5% that is $2.05 a day. Multiply it by the days since interest was last paid to get the interest owed.

How do I convert APR to daily interest?

Divide the APR by 365, or by 360 if your card issuer does. A 22.36% APR is a daily periodic rate of 0.06126% on 365 days and 0.06211% on 360. Multiply that rate by the balance for one day's interest.

Is per diem the same as daily interest?

Yes, per diem means per day. The per diem is the dollars of one day's interest, and the daily periodic rate is the percent. On $25,000 at 8% the per diem is $5.48 and the daily rate is 0.02192%.

What is the difference between exact interest and ordinary interest?

Exact interest divides a year's interest by 365 days and ordinary interest by 360. On $5,000 at 12% for 90 days, exact interest is $147.95 and ordinary interest is $150.00. The worked examples above show the steps for another loan.

What is 6% interest on a $200,000 loan?

It is $12,000 a year. By the day that is $32.88 on a 365-day year or $33.33 on a 360-day year. A loan that charges a twelfth of the yearly rate charges $1,000.00 a month on that balance.

How do I calculate my interest rate from my per diem?

Multiply the per diem by 365 and divide by your balance. A per diem of $8.22 on $50,000 gives $8.22 × 365 ÷ $50,000 = 6.0006%, so the note rate is 6%. The extra digits come from rounding the per diem to the cent.

What is per diem interest at closing?

The CFPB's answer on prepaid interest says prepaid interest covers the daily interest from the day you close to "the period covered by your first monthly mortgage payment." Close on November 18 with a first payment that covers December, and on $200,000 at 6.5% you prepay 13 days of interest, $463.01. It is listed in section F on page 2 of your Loan Estimate and your Closing Disclosure.