Cubic Yards Calculator

A 10 × 10 ft area 4 inches deep holds 1.23 cubic yards; as a compacted gravel base it takes 1.44 loose cubic yards. Enter your shape to see yards to order and tons.

Last reviewed

How much you need

Volume

1.23 cu yd

To order, loose

1.44 cu yd

Weight

2.05 tons

A 10 × 10 ft area 4 inches deep holds 1.23 cubic yards (33.33 cubic feet, 0.944 cubic meters).

Compacting takes 1.17 loose cubic yards for each compacted cubic yard, so order 1.44 loose cubic yards, about 2.05 tons.

Dry gravel weighs 2,700 to 3,000 lb a loose cubic yard, so the scale ticket could read 1.94 to 2.16 tons.

Each extra quarter inch of depth adds 6.25% to the volume.

Buying gravel by the ton? Compare quotes with the aggregate price comparison calculator. Pouring concrete or spreading mulch? The concrete bags calculator and the mulch calculator count bags.

Your area and material

Gravel, sand and soil weights are averages.
In feet as a decimal: 14 ft 9 in is 14.75.
The finished thickness, after any packing down.
Loose for a garden bed. Packing a base down shrinks it, so it takes more loose material.

Plan of the area

Plan of the area: a rectangle 10 feet by 10 feet, 100 square feet, 4 inches deep, 1.23 cubic yards.10 ft10 ft100 sq ft4 in deep · depth not to scale
100 sq ft × 4 in ÷ 324 = 1.23 cu yd
Worked sheet for Cubic Yards: how the weight of 2.05 tons is worked out, in 5 steps.Cubic Yardscu yd = area × depth ÷ 324order = cu yd × factortons = order × lb per cu yd ÷ 2,000area = 10 ft × 10 ft = 100 sq ftvolume = 100 sq ft × 4 in ÷ 12 = 33.33 cu ft33.33 cu ft ÷ 27 = 1.23 cu ydorder = 1.23 × 1.17 = 1.44 loose cu ydweight = 1.44 × 2,850 lb ÷ 2,000 =2.05 tons
  1. area = 10 ft × 10 ft = 100 sq ft
  2. volume = 100 sq ft × 4 in ÷ 12 = 33.33 cu ft
  3. 33.33 cu ft ÷ 27 = 1.23 cu yd
  4. order = 1.23 × 1.17 = 1.44 loose cu yd
  5. weight = 1.44 × 2,850 lb ÷ 2,000 = 2.05 tons
How 2.05 tons of gravel is worked out

What to order in each material

MaterialTo order (cu yd)Weight (tons)
Concrete, 10% extra1.352.73range 2.55 to 2.73
Gravel, dry, compactedyour choice1.442.05range 1.94 to 2.16
Gravel, dry, loose1.231.75range 1.66 to 1.85
Sand, dry, compacted1.441.98range 1.87 to 2.09
Sand, dry, loose1.231.69range 1.60 to 1.78
Soil (loam), dry, compacted1.711.75range 1.62 to 1.88
Soil (loam), dry, loose1.231.26range 1.17 to 1.35
Mulch1.23sold by volume

Concrete makes the heaviest order at 2.73 tons and loose soil the lightest at 1.26 tons. Compacting gravel adds 0.21 cubic yards and 0.30 tons.

How to calculate cubic yards

Find the area in square feet, multiply it by the depth in inches, then divide by 324. The 324 is 27 cubic feet in a cubic yard times 12 inches in a foot. For a 10 × 10 ft area 4 inches deep, 100 × 4 ÷ 324 = 1.23 cubic yards. Clemson Cooperative Extension's mulch fact sheet puts it this way: "One cubic yard will cover a 324-square-foot area with an inch of mulch."

Only the area changes with the shape. A circle is π times the radius squared, where the radius is half the distance across. A circle 10 ft across covers 78.54 sq ft. A triangle is half the base times the height, measured square to the base. A ring is the outer circle minus the hole: 12 ft across with an 8 ft hole leaves 62.83 sq ft. For an L-shaped bed, add two rectangles: 10 × 10 ft plus 6 × 4 ft is 124 sq ft, or 1.53 cubic yards at 4 inches.

Gravel, sand and soil can be sold by weight as well as by volume, so you need the tons too. Multiply the amount to order by the material's weight per loose cubic yard, then divide by 2,000 lb, the short ton. The sections below give the weights and the reasons to order more than you measure.

Why depth matters most

A small error in the depth changes the volume by the same share. A quarter inch is 6.25% of a 4-inch base but 12.5% of a 2-inch layer of mulch. The ready-mixed concrete industry's sheet on yield (NRMCA CIP 8) gives an example. An extra 1/8 inch on a 4-inch slab is a 3% shortage: 1 cubic yard short on a 32-yard order. Measure the depth in several places and enter the average. For anything you will pack down, enter the finished thickness.

Cubic yards to tons

Weight depends on the material. The Army's earthmoving manual, TM 3-34.62 (2025), lists what a loose cubic yard weighs. Dry gravel is 2,700 to 3,000 lb, dry sand 2,600 to 2,900 lb, and dry loam or silt 1,900 to 2,200 lb. The calculator uses the middle of each range and shows both ends. The manual warns: "Weights and load factors vary with such factors as grain size, moisture content, and degree of compaction." Wet gravel or sand runs 2,800 to 3,100 lb.

Concrete is heavier still. Quikrete's data sheet gives a unit weight of about 140 lb per cubic foot for concrete made from its mix. The Army's concrete manual, TM 3-34.44, uses 150 lb to work out the loads on forms. That is 3,780 to 4,050 lb a cubic yard, and the calculator uses the higher figure. Mulch is sold by volume, as the section on how each material is sold explains, so the calculator gives its volume only. For screened topsoil, compost or garden soil, the topsoil, compost and garden soil calculator works by the bag or the yard.

Ordering: compaction, waste and rounding

Loose and compacted cubic yards

Gravel, sand and soil take more room in the truck than in the finished base. Table 1-1 of the earthmoving manual gives the numbers. One compacted cubic yard of sand or gravel takes 1.17 loose cubic yards, and one of common earth takes 1.39. The estimating manual the Navy, Army and Marine Corps share repeats the table with this note: "The cubic volume of fill (as compacted in place) times the multiplier equals the cubic volume of loose materiel required to be compacted fill."

Suppose you order only the 1.23 cubic yards a 4-inch base measures. The table's factor of 0.86 for loose to compacted packs it down to about 3.44 inches. That is why the calculator orders 1.44 loose cubic yards for the 10 × 10 ft base.

How each material is sold

NIST Handbook 130 holds the model regulation for how goods are sold. Section 2.18.2 says "All mulch shall be sold, offered, or exposed for sale in terms of volume measure … in U.S. customary units in terms of the cubic yard or cubic foot." Under Section 2.29, topsoil, fill dirt, aggregate, sand and landscape rock sold in bulk "must be sold by the cubic meter or cubic yard or by weight." The handbook's table of state adoptions is dated November 1, 2025. Its totals row counts 18 jurisdictions that adopt each year's edition and 27 that based theirs on an earlier one, so check with your state's weights and measures office. Ready-mixed concrete is sold by the volume of fresh concrete as the truck discharges it, the National Ready Mixed Concrete Association (NRMCA) explains in its sheet on yield.

Extra for waste, and rounding up

Plan on extra concrete. The estimating manual (TM 3-34.41) adds 10% to concrete jobs under 200 cubic yards and 5% from 200 up, and this calculator does the same. The Army's concrete manual (TM 3-34.44) puts exactly 200 cubic yards in the 10% band instead, so at that size the two differ. NRMCA's yield sheet tells buyers to "order more than the original volume estimate by at least 4 to 10 percent." Gravel and sand that you compact get the compaction factor instead of a waste allowance.

Then round up to the unit your supplier sells by, and round bags up to whole bags. TM 3-34.44 puts it plainly: "Round values up to the next whole number since you cannot order partial sacks."

Video walkthrough

A 3-minute walkthrough of how an area and a depth become cubic yards, why a packed gravel base takes more than it measures and how to check what you order.

How Many Cubic Yards Do You Need? Gravel, Soil or Concrete
Read the transcript

How much gravel a pad needs

0:00 Say you're laying a square gravel pad, 10 feet on each side, and 4 inches deep once it's packed down.

0:07 How much gravel do you need?

0:09 The pad holds about 1¼ cubic yards.

0:13 But gravel shrinks as it's packed, so you'd order about 1½ cubic yards of loose gravel.

0:19 Every shape works the same way.

0:22 Find the area, multiply by the depth, and turn the result into cubic yards.

From cubic feet to cubic yards

0:27 Start with the area: the length times the width.

0:31 Then change the depth from inches to feet, and multiply again.

0:35 That gives the volume in cubic feet.

0:38 A cubic yard is a cube one yard on each side.

0:42 Fill it with one-foot cubes, and 27 fit inside.

0:46 So divide the cubic feet by that number.

How far a cubic yard goes

0:49 Now spread one cubic yard out flat, the way you'd rake it over the ground.

0:54 At this depth, it covers 81 square feet, a square a little smaller than your pad.

1:01 Go half as deep, and the same yard covers twice the area.

1:05 Go deeper, and it covers much less.

1:08 That's why the depth is the number to measure with care.

1:11 Clemson Extension's mulch fact sheet starts from one inch of depth.

Circles, triangles and rings

1:16 Other shapes change only the area.

1:19 For a round patio, choose Circle and enter the distance across.

1:23 The drawing turns into a circle, and the cubic yards follow from the new area.

1:29 For a triangle, measure the height square to the base, not along a sloping side.

1:34 Measured along the side, its area would come out about 12% too big, and your order nearly as much.

1:42 For a bed around a tree, choose Ring.

1:44 Enter the outer diameter, then the hole.

1:47 The calculator draws the ring, and takes the hole away.

Why you order more than you measure

1:51 Back to the gravel pad.

1:53 The Army's earthmoving manual lists how much each material shrinks when it's packed.

1:59 For sand or gravel, a packed cubic yard takes 17% more loose material.

2:05 If your supplier sells by the ton, the calculator gives the weight too, about 2 tons for this pad.

2:12 Gravel varies, so if your supplier gives a weight per cubic yard, choose Other and enter it, and the weight changes to match.

Before you order

2:20 If you didn't see the load measured, NIST's handbook, under Sale from Bulk, calls for a delivery ticket showing the quantity delivered.

2:30 Compare that with the amount to order, not the pad's volume.

2:34 For concrete, the calculator adds 10% for waste, as a military estimating manual does for smaller jobs.

2:43 Then round up to what your supplier sells.

2:46 So: multiply the area by the depth in feet, divide the cubic feet by 27, and add extra for packing or for concrete waste.

2:55 Try your own numbers at fastcalc.us.

Cubic yards formula

rectangle area = L × W
triangle area = ½ × B × H
circle area = π × (D ÷ 2)²
ring area = π × ((Do ÷ 2)² − (Di ÷ 2)²)
cu ft = area × depth ÷ 12
cu yd = area × depth ÷ 324
m³ = cu yd × 0.764554857984
order = cu yd × 1.10 (concrete under 200 cu yd; 1.05 from 200)
order = cu yd × 1.17 (gravel or sand) or × 1.39 (soil), when compacted
tons = order × lb per loose cu yd ÷ 2,000
order is worked from cu yd, and tons from order, each rounded to 2 decimals first (unrounded when it would show as less than 0.01)
L length · W width · B base · H height · D diameter
Do outer and Di inner diameter, all in ft · depth in inches

Worked examples

A gravel pad 10 × 10 ft and 4 inches thick, compacted, holds 1.23 cubic yards in place. Times 1.17 gives 1.44 loose cubic yards to order. At 2,850 lb a loose cubic yard that is 4,104 lb, or 2.05 tons.

A round concrete patio 12 ft across and 4 inches thick covers π × 6² = 113.10 sq ft and holds 1.40 cubic yards. With 10% extra the order is 1.54 cubic yards, or 1.75 if the plant sells quarter yards. The order weighs about 3.12 tons.

A military estimating manual (TM 3-34.41, 2021) prints a table of concrete per 100 sq ft. This calculator gives the same 1.85, 2.47 and 3.70 cubic yards for its 6, 8 and 12 inch rows. Its 4-inch row says 1.24 and its 10-inch row 3.90, but its own cubic feet give 33.3 ÷ 27 = 1.23 and 83.3 ÷ 27 = 3.09.

Check your delivery ticket

When you did not watch a bulk load being measured, the model weights and measures law in Handbook 130 (Section 17) says the sale "shall be accompanied by a delivery ticket." The ticket must list "the quantity delivered and the quantity upon which the price is based, if this differs from the delivered quantity."

Check that line against this page. If it is in cubic yards, compare it with "To order", not "Volume". If it is in tons, divide by your supplier's weight per loose cubic yard; the Army's range is too wide for this check. From 2,700 to 3,000 lb, a 2.05-ton ticket is 1.37 to 1.52 loose cubic yards, against the 1.44 ordered. In Handbook 130's model Uniform Weighmaster Law (Section 10), a weighmaster's certificate shows the gross weight, the tare (empty truck) weight, or both with the net weight. Not every state has adopted that model. The net weight is the material.

For ready-mixed concrete, NRMCA's yield sheet (CIP 8) notes that hardened concrete in place can measure about 2% less than its fresh volume. So a slab can look a little short even when the load was full.

Slopes, walls, holes and digging out

Slopes. Measure the area along the ground when the depth is the thickness of the layer. A 3-to-1 slope runs 3 ft across for each foot of rise, and its surface is 5.4% larger than its footprint. On a 2-to-1 slope the surface is 11.8% larger. The roof pitch calculator gives this factor, its pitch multiplier, for any slope.

Walls and footings. Treat the face of a wall as the area and its average thickness as the depth. The Army's concrete manual (TM 3-34.44) works a retaining wall 75 ft long, 14 ft 9 in high and 8 to 12 inches thick. At 75 × 14.75 ft and 10 inches it is 921.9 cubic feet, and its footing, 75 × 8.5 ft at 15 inches, is 796.9. Together they make 63.66 cubic yards. The manual rounds that to 63.7 before adding 10%, so it orders 70.1 cubic yards; from the 63.66 shown here the order is 70.03. The concrete footing calculator handles strip and pad footings.

Holes and posts. Use Circle with the hole's depth: a hole 1 ft across and 36 inches deep holds 0.09 cubic yards before the post goes in. The post hole concrete calculator subtracts the post.

Digging out. Soil swells when it leaves the ground. Dug 4 inches deep, the 10 × 10 ft area is a hole of 1.23 cubic yards. It fills 1.54 cubic yards of truck space in loam, 1.25 times the hole, and 1.76 in clay, 1.43 times. The excavation volume calculator counts the truckloads, and the soil swell and shrink calculator converts between bank (in the ground), loose and compacted yards.

Assumptions and limits

  • The depth is the same across the whole area. For uneven ground, enter the average of several measurements.
  • Areas are measured flat, as seen from above. On a slope, see the special cases above.
  • The weights of gravel, sand and soil are the Army's averages for common materials. Your supplier's own figures come first. With Other, the calculator uses your density and, when compacted, the factor for sand and gravel.
  • Concrete includes the waste allowance explained under ordering. Mulch is worked by volume only.
  • Sizes from 0.01 to 10,000 ft and depths from 0.01 to 1,200 inches.
  • Slab thickness and base depth come from your plans or local code.

These figures are calculation aids, not a code determination. Always follow the code adopted where you live, your local inspector and a licensed professional. Terms of use.

Before you order

Ask the supplier for its weight per loose cubic yard, then choose Other and enter it in tons per cubic yard: divide pounds by 2,000, so 2,850 lb is 1.425. Across the Army's range for dry gravel, the default order could weigh 1.94 to 2.16 tons. Compare per-ton and per-yard prices with the aggregate price comparison calculator.

Check the delivery ticket against the amount to order: 1.44 loose cubic yards for the default base. If you order by weight without the supplier's figure, 2.16 tons covers that even at 3,000 lb a yard, the heavy end for dry gravel; at the light end it is 1.60 loose cubic yards.

Before you haul it yourself, compare the weight with the tire and loading placard on the driver's door pillar or, on some trucks, a door edge. Federal Motor Vehicle Safety Standard No. 110 (49 CFR 571.110, S4.3) puts one on trucks rated 10,000 lb GVWR or less, except incomplete vehicles, and has it say "The combined weight of occupants and cargo should never exceed XXX kilograms or XXX pounds." The default order weighs 4,104 lb. The payload capacity calculator does the subtraction, and the dump truck load calculator counts loads for bigger jobs.

With 10% extra, the 10 × 10 ft area 4 inches thick takes 61 bags of 80 lb concrete mix. As mulch it takes 17 bags of 2 cubic feet. The concrete bags calculator and the mulch calculator handle other bag sizes.

Frequently asked questions

How many cubic yards is 7 × 14 × 2?

It depends on what the 2 measures. If all three are feet, 7 × 14 × 2 = 196 cubic feet, which is 7.26 cubic yards. If the 2 is inches of depth, 7 × 14 × 2 ÷ 324 = 0.60 cubic yards. Write the depth in inches to avoid the mix-up.

Is a cubic yard 3 feet by 3 feet by 3 feet?

Yes. A cube 3 ft on each side holds 27 cubic feet, or 46,656 cubic inches (36 × 36 × 36). That is different from a yard, which is a length of 3 ft. NIST Handbook 44 lists a cubic yard as 0.764554857984 cubic meters.

How much area does 1 cubic yard cover?

Divide 324 by the depth in inches. A cubic yard covers 324 sq ft at 1 inch, 162 at 2 inches and 108 at 3 inches. At 4 inches it covers 81, so 2 cubic yards cover 162 sq ft, and at 6 inches 54. Gravel you compact shrinks to 0.86 of its loose volume, so a loose cubic yard makes a 4-inch base of about 70 sq ft.

How many tons is a cubic yard of gravel?

About 1.35 to 1.50 tons when dry and loose, from the Army's weight table, and 1.40 to 1.55 tons when wet. So a cubic yard is not a ton: 5 cubic yards of dry gravel is 6.75 to 7.50 tons. Ask your supplier for its own figure.

How many 80 lb bags of concrete are in a yard?

About 45: an 80 lb bag of Quikrete concrete mix yields about 0.60 cubic foot, and a yard is 27 cubic feet. Bags of 60 lb, at 0.45 cubic foot, take 60. With 10% extra that is 50 and 66 bags. Check the yield printed on your brand's bag.

Can you fit a yard of gravel in a pickup truck?

Only if the truck may carry its weight: a loose cubic yard of dry gravel weighs 2,700 to 3,000 lb. The placard on the driver's door pillar or door edge gives the most the truck should carry in people and cargo. At 1,500 lb on the placard and 300 lb of people, a trip can carry 0.40 cubic yards of dry gravel or 0.54 of dry soil. Those allow for the heaviest material in the Army's ranges.

How many yards of concrete do I need for a 24 × 24 × 4 slab?

A 24 × 24 ft slab 4 inches thick is 576 × 4 ÷ 324 = 7.11 cubic yards. With 10% extra it is 7.82. Round that up to the increment your supplier sells: in whole or quarter yards, that is 8.

How many bags of mulch is 4 yards?

4 cubic yards is 108 cubic feet, so 54 bags of 2 cubic feet or 36 bags of 3 cubic feet. For another size, divide 27 by the cubic feet printed on the bag to get the bags in each cubic yard.

Sources

Embed this calculator

Paste this code into your page. The credit line under the frame is optional.