Well Yield and Drawdown Test Calculator
Enter your pumping rate, water levels, and recovery rise. A 10 gpm test with 30 ft of drawdown gives 0.333 gpm/ft and a 26.7 gpm upper-end yield estimate.
Last reviewed
Well yield and drawdown results
Upper-end yield estimate
26.7 gpm
Average refill
2.84 gpm
Drawdown
30.0 ft
Upper-end yield estimate: 26.7 gpm, 2.7 times the 10.00 gpm tested, from 0.333 gpm/ft over 80.0 ft to the intake.
Drawdown of 30.0 ft (from 40 ft to 70 ft) gives 0.333 gpm/ft specific capacity, with the pumping level 50.0 ft above the intake.
Of the 600 gal pumped in 60 min, 44.1 gal (7.3%) came from casing storage and 555.9 gal from the rock, averaging 9.27 gpm.
The estimate meets the 12.00 gpm Table 2 minimum flow, but the test pumped only 10.00 gpm; a test near 12.00 gpm would confirm it.
Your pumping test and well details
- Drawdown = 70.0 ft − 40.0 ft = 30.0 ft
- Specific capacity = 10.00 gpm ÷ 30.0 ft = 0.333 gpm/ft
- Casing volume = π × (3.00 in ÷ 12)2 × (1,728 ÷ 231) = 1.469 gal/ft
- Drawdown storage = 30.0 ft × 1.469 gal/ft = 44.1 gal
- Average refill rate = (29.0 ft × 1.469 gal/ft) ÷ 15 min = 2.84 gpm
- Yield estimate = 0.333 gpm/ft × 80.0 ft = 26.7 gpm
Standing borehole storage and drawdown volume by casing diameter
Average refill rate across casing diameters
Specific Capacity and Pumped Volume by Pumping Rate
At 1 gpm, specific capacity is 0.033 gpm/ft (60 gal pumped); at 20 gpm, specific capacity is 0.667 gpm/ft (1,200 gal pumped).
| Pumping rate | Specific capacity | Water pumped | From casing storage |
|---|---|---|---|
| 1 gpm | 0.033 gpm/ft | 60 gal | 73.4% |
| 3 gpm | 0.1 gpm/ft | 180 gal | 24.5% |
| 5 gpm | 0.167 gpm/ft | 300 gal | 14.7% |
| 6 gpm | 0.2 gpm/ft | 360 gal | 12.2% |
| 8 gpm | 0.267 gpm/ft | 480 gal | 9.2% |
| 10 gpm (closest to your input) | 0.333 gpm/ft | 600 gal | 7.3% |
| 15 gpm | 0.5 gpm/ft | 900 gal | 4.9% |
| 20 gpm | 0.667 gpm/ft | 1,200 gal | 3.7% |
Total water pumped during test, by pumping rate (down) and test duration in minutes (across).
| Pumping rate by test duration | 30 min | 60 min | 120 min | 240 min |
|---|---|---|---|---|
| 1 gpm | 30 gal | 60 gal | 120 gal | 240 gal |
| 3 gpm | 90 gal | 180 gal | 360 gal | 720 gal |
| 5 gpm | 150 gal | 300 gal | 600 gal | 1,200 gal |
| 6 gpm | 180 gal | 360 gal | 720 gal | 1,440 gal |
| 8 gpm | 240 gal | 480 gal | 960 gal | 1,920 gal |
| 10 gpm (closest to your input) | 300 gal | 600 gal | 1,200 gal | 2,400 gal |
| 15 gpm | 450 gal | 900 gal | 1,800 gal | 3,600 gal |
| 20 gpm | 600 gal | 1,200 gal | 2,400 gal | 4,800 gal |
Average Refill Rate by Observation Time
For a 29.0 ft recovery rise, a 10 min observation averages 4.26 gpm, compared with 0.35 gpm over 120 min; the longer the window, the lower the average.
| Recovery observation time | Average refill rate |
|---|---|
| 10 min | 4.26 gpm |
| 15 min (closest to your input) | 2.84 gpm |
| 20 min | 2.13 gpm |
| 30 min | 1.42 gpm |
| 45 min | 0.95 gpm |
| 60 min | 0.71 gpm |
| 90 min | 0.47 gpm |
| 120 min | 0.35 gpm |
Average refill rate in gpm, by recovery observation time in minutes (down) and casing diameter in inches (across).
| Recovery observation time by well casing diameter | 4 in | 6 in | 8 in | 10 in | 12 in |
|---|---|---|---|---|---|
| 10 min | 1.89 gpm | 4.26 gpm | 7.57 gpm | 11.83 gpm | 17.04 gpm |
| 15 min (closest to your input) | 1.26 gpm | 2.84 gpm | 5.05 gpm | 7.89 gpm | 11.36 gpm |
| 20 min | 0.95 gpm | 2.13 gpm | 3.79 gpm | 5.92 gpm | 8.52 gpm |
| 30 min | 0.63 gpm | 1.42 gpm | 2.52 gpm | 3.94 gpm | 5.68 gpm |
| 45 min | 0.42 gpm | 0.95 gpm | 1.68 gpm | 2.63 gpm | 3.79 gpm |
| 60 min | 0.32 gpm | 0.71 gpm | 1.26 gpm | 1.97 gpm | 2.84 gpm |
| 90 min | 0.21 gpm | 0.47 gpm | 0.84 gpm | 1.31 gpm | 1.89 gpm |
| 120 min | 0.16 gpm | 0.35 gpm | 0.63 gpm | 0.99 gpm | 1.42 gpm |
Borehole Storage and Average Refill Rate by Casing Diameter
| Casing (in) | Volume (gal/ft) | Drawdown storage (gal) | Standing storage (gal) | Average refill rate (gpm) |
|---|---|---|---|---|
| 4 | 0.653 | 19.6 | 52.2 | 1.26 |
| 6 | 1.469 | 44.1 | 117.5 | 2.84 |
| 8 | 2.611 | 78.3 | 208.9 | 5.05 |
| 10 | 4.080 | 122.4 | 326.4 | 7.89 |
| 12 | 5.875 | 176.3 | 470.0 | 11.36 |
| 24 | 23.501 | 705.0 | 1,880.1 | 45.43 |
A 6-in casing holds 1.469 gal/ft (117.5 gal above the 120 ft intake; 44.1 gal left it across 30.0 ft of drawdown). The 29.0 ft rise in 15 min is an average refill of 2.84 gpm, not a yield.
Flow Rate Benchmarks and Volumes
| Benchmark | Flow rate (gpm) | In 2 hours (gal) | In 4 hours (gal) | In 24 hours (gal) |
|---|---|---|---|---|
| Your test (pumping rate) | 10.00 | 1,200 | 2,400 | 14,400 |
| Your well (upper-end estimate) | 26.70 | 3,204 | 6,408 | 38,448 |
| FHA existing construction | 3.00 | 360 | 720 | 4,320 |
| FHA new construction | 5.00 | 600 | 1,200 | 7,200 |
| Penn State single-family suggested minimum | 6.00 | 720 | 1,440 | 8,640 |
| Penn State Table 2 minimum (3 BR, 2 bath) | 12.00 | 1,440 | 2,880 | 17,280 |
At 26.7 gpm, the upper-end estimate would give 3,204 gal in 2 hours and 6,408 gal in 4 hours. For comparison: 720 gal in 4 hours is 3.00 gpm (the storage volume for an existing home on a shared well), 1,200 gal in 4 hours is 5.00 gpm (FHA new construction), and 1,440 gal in 2 hours at Table 2's 12.00 gpm suggested minimum. Your test ran 60 min, shorter than the 4 hours (240 min) in 24 CFR 200.926d(f)(2)(i).
How it works
A constant-rate well yield test tracks two steps. First, you measure how far the water drops while the pump runs. Second, you time how fast the hole refills after the pump stops. In its Water Basics Glossary, the U.S. Geological Survey (USGS) defines drawdown as "The difference between the water level in a well before pumping and the water level in the well during pumping." Dividing the pumping rate by drawdown gives specific capacity, which the USGS glossary defines as "The yield of a well per unit of drawdown." At 10 gpm with a 40 ft static level and 70 ft pumping level, drawdown is 30.0 ft. That gives a specific capacity of 0.333 gpm/ft.
In Water System Planning: Estimating Water Needs, Penn State Extension defines well yield as "the maximum rate in gallons per minute (GPM) that a well can be pumped without lowering the water level in the borehole below the pump intake." This tool gives an upper-end estimate of that yield in a straight line: specific capacity times the feet of water between the static level and the pump intake. Specific capacity often drops at higher flow, so treat the figure as an upper-end estimate and confirm it with a test run near that rate. As Penn State Extension notes, "A typical 6-inch-diameter well will store about 1.5 gallons of water for every foot of standing water in the borehole and a 10-inch well stores about 4 gallons of water per foot." By exact cylinder math, a 6-inch pipe holds 1.469 gal/ft.
Casing water is not new supply. Drawdown times gallons per foot is the water the pump took from standing storage, and the rest of the pumped volume came from the rock. The refill figure divides the water rise after pumping stops by the minutes you watched. It is an average over that interval. Inflow slows as the water rises, so a longer window gives a lower average. The figure is not a yield. If the pumping level is below the pump intake, the estimate comes out lower than the test rate, before rounding. Send your pumping rate to the well pump head calculator to find total head. You can also check power bills in the well pump electricity cost calculator.
How to Read an FHA or HUD Well Yield Report
When you buy a home with an FHA loan, the lender checks the well against federal rules in 24 CFR 200.926d and HUD Handbook 4000.1. For a new home under 24 CFR 200.926d(f)(2)(i), the rule states: "The system should be capable of delivering a flow of 5 gpm over at least a 4 hour period." Five gpm for 240 minutes is 1,200 gallons. Under 24 CFR 200.926d(f)(5)(i), pump capacity shall not exceed the output of the well. Under (f)(6)(i), a pressure tank of at least 42 gallons must be provided. Prepressured tanks and other pressurizing devices are acceptable if their delivery between pump cycles equals or exceeds that of a 42 gallon tank.
Existing homes follow HUD Handbook 4000.1 section II.A.3.a.ii(N)(2). That handbook states: "Existing wells must deliver a continuous water flow at a minimum of three gallons per minute". Shared wells under HUD Handbook 4000.1 section II.A.3.a.ii(N)(3) may serve at most 4 homes. A shared well must supply 3 gpm per existing home, or 5 gpm per new home, over a 4-hour test. When flow is lower, pressurized storage must deliver 720 gallons per existing home in 4 hours, the same volume as 3 gpm for 4 hours. Each new home on a shared well needs 1,200 gallons in 4 hours.
HUD Handbook 4000.1 section II.A.3.a.ii(N)(2)(a) and (b) says who tests and how old a report may be. Those items sit under the handbook's heading for well water testing, so they govern the water-quality sample, not a flow reading. Under HUD Handbook 4000.1, a water test is required for properties that are newly constructed, among other cases. The handbook states: "All testing must be performed by a disinterested third party." It adds: "At no time will the Borrower/owner or other Interested Party collect and/or transport the sample." It also states: "When a well test is required, the report may not be more than 180 Days old from the Disbursement Date." Under 24 CFR 200.926d(f)(3)(iv) and HUD Handbook 4000.1, a well must sit at least 10 feet from a property line and 50 feet from a septic tank. It must also sit 100 feet from a drain field, or 75 feet for existing homes where local rules allow.
Using Low-Yielding Wells and Sizing Storage
Penn State Extension suggests a minimum flow of 6 gpm for most single-family homes. Its Table 2 lists higher flows for larger homes, such as 12 gpm for a 3-bedroom, 2-bathroom house. It adds: "If not, you may need to rely on water storage to meet peak demand periods." In Using Low-Yielding Wells, Penn State Extension notes that a 1 gpm well makes 1,440 gallons in 24 hours. Its Estimating Water Needs guide cites EPA figures of 80 to 100 gallons per person per day, and 200 to 400 gallons per day for a family of four. The real crunch is the 2-hour morning or evening peak. Penn State Extension recommends that a system supply all of a day's projected use in that period: 400 gallons in 2 hours is 3.33 gpm. In 2 hours, a 1 gpm well gives 120 gallons. Meanwhile, showers and laundry can pass 300 gallons, and a cycle from the water softener size calculator (50 to 100 gallons) adds to that.
Standing water in the borehole acts as your first reserve above the pump intake. A 100-foot column of water stores 147 gallons in a 6-inch well and 408 gallons in a 10-inch well (261 gallons more). If a dry spell drops the water column below 20 feet, a 10-inch hole holds only about 50 gallons more than a 6-inch hole. Inside the house, a pressure tank running from 20 psi to 40 psi gives about 20% of its total size as usable water. That equals 8 gallons from a 42-gallon tank, 16 gallons from an 82-gallon tank, or 24 gallons from a 120-gallon tank. You can check your exact tank buffer in the pressure tank drawdown calculator.
When hole storage and the pressure tank fall short, Penn State Extension suggests an intermediate holding tank with a booster pump. Size that tank at 100 gallons per person in the home. That is 500 gallons for five people, or at least 2,000 gallons on a farm. Use the water pressure elevation calculator to check how pipe height changes booster pressure. Whenever you open a well cap for a test or pump job, find your bleach dose in the well shock chlorination calculator. Also follow the U.S. Environmental Protection Agency (EPA) guide Protect Your Home's Water. Test once a year for coliform bacteria, nitrates, total dissolved solids, and pH.
Video walkthrough
A walkthrough of what a well yield test does and does not tell you: the drawdown, the straight-line estimate, casing storage against water from the rock, and when the page calls an estimate not reliable.
Read the transcript
What a yield test tells
0:00 How much water can your well supply?
0:02 A pumping test gives a first estimate.
0:05 Say you pump 10 gpm for 60 min, and the water level drops 30 feet.
0:11 The page says the well can give up to about 27 gpm.
0:16 That is an upper-end estimate, drawn as a straight line.
0:20 It is not a promise.
0:21 Penn State Extension defines well yield as the maximum rate a well can be pumped without lowering the water level in the borehole below the pump intake.
From drawdown to estimate
0:32 Start with the drop.
0:33 Before pumping, the water stood at 40 feet.
0:36 At the end, it was at 70 feet.
0:39 Divide the pumping rate by that drop, and you get the flow for each foot, called specific capacity.
0:45 Next, the page runs that line down to the pump.
0:49 The pump intake sits at 120 feet, so 80 feet of water stand above it.
0:54 Multiply, and you get the estimate.
Casing storage and the rock
0:57 Now ask where the pumped water came from.
1:00 The pump moved about 600 gallons.
1:03 A casing 6 inches wide holds about 1.5 gallons for every foot of water in it.
1:09 The drop pulled about 44 gallons out of the casing.
1:13 The rest, about 560 gallons, had to come from the rock.
1:18 That is about 7% from storage.
1:21 The rock supplied an average of about 9.3 gpm, most of what the pump moved.
When the estimate fails
1:27 Now change the test.
1:29 Say you pump only 1.5 gpm, until the level reaches the pump intake.
1:35 The casing gives up about 65% of the water, and the rock supplies only about 0.52 gpm.
1:43 So the headline reads Not reliable.
1:46 One reason the page calls an estimate not reliable is when half or more of the pumped water came from the casing.
1:53 Here, the casing, not the rock, supplied most of the water.
1:58 When a well's yield is below the minimum flow for a home, Penn State Extension says you may need to rely on water storage at peak times.
Refill and minimum flows
2:08 Back to the first test.
2:09 After the pump stopped, the water level rose back up.
2:13 That is an average refill of about 2.8 gpm.
2:17 It is an average over the minutes you watched, not the well's yield.
2:21 To judge a yield, compare it with a minimum.
2:24 Table 2 from Penn State Extension lists minimum flow rates by bedrooms and bathrooms.
2:30 A home with 2 bedrooms, 1 bathroom needs 6 gpm.
2:34 With 3 bedrooms, 2 bathrooms, it is 12 gpm.
2:39 With 6 bedrooms, 3 bathrooms, it is 18 gpm.
2:44 For the first test, the page says the estimate meets the minimum.
2:48 But the test pumped less than that, so a test near the minimum would confirm it.
Try your own test
2:53 To try your own test, fill in the form: the pumping rate, how long you pumped, the water levels, the pump intake and the casing width.
3:02 Say you pump 6 gpm.
3:04 The results update as you type, and the estimate becomes about 16 gpm.
3:10 So remember this.
3:11 The estimate is an upper-end guess, not a promise.
3:15 Check how much water came from the casing.
3:17 And compare with Table 2, then try your own test at fastcalc.us.
Formula
Drawdown (ft) = Pumping water level − Static water level Specific capacity (gpm/ft) = Pumping rate ÷ Drawdown Casing volume (gal/ft) = π × (Casing diameter ÷ 24)^2 × (1,728 ÷ 231) Average refill rate (gpm) = (Recovery rise × Casing volume) ÷ Recovery time Upper-end yield estimate (gpm) = Specific capacity × (Pump intake depth − Static water level) Water from the rock (gal) = Water pumped − Drawdown × Casing volume
Example
Take a 6-inch home well with a static water level at 40 ft and a pump intake at 120 ft. You pump at 10.00 gpm for 60 minutes, and the water drops to 70 ft. Drawdown is 70 − 40 = 30.0 ft. Specific capacity is 10.00 ÷ 30.0 = 0.333 gpm/ft, and water stays 50.0 ft above the 120 ft intake. In 60 minutes the pump moves 600 gal. Of that total, 30.0 ft × 1.469 gal/ft = 44.1 gal (7.3%) comes from casing drawdown storage. The other 555.9 gal flows in from the rock, an average of 9.27 gpm. At rest, the 80.0 ft column above the intake holds 80.0 × 1.469 = 117.5 gal.
Between the 40 ft static level and the 120 ft intake lie 80.0 ft of water. At 0.333 gpm/ft, the upper-end yield estimate is 0.333 × 80.0 = 26.7 gpm, 2.7 times the tested rate. That is 14.7 gpm above Penn State Table 2's 12 gpm minimum flow for a 3-bedroom, 2-bathroom home. The 10.00 gpm test rate sits 2.00 gpm below it. Because specific capacity often drops at higher flow, a test run near 12 gpm would confirm that the well meets 12 gpm. After you shut the pump off, the water rises 29.0 ft in 15 minutes, climbing from 70 ft back to 41 ft. That rise holds 29.0 × 1.469 = 42.6 gal. Dividing by 15 minutes gives an average refill of 2.84 gpm. That average is below the test rate because rock inflow slows as the level rises, so it is not the yield.
Assumptions and limitations
- Casing volume per foot uses exact cylinder math (1 US gallon = 231 cubic inches; 1 cubic foot = 1,728 cubic inches). This gives 1.469 gal/ft at 6 in and 4.080 gal/ft at 10 in, rather than rounded 1.5 and 4 gal/ft approximations.
- The yield estimate equals specific capacity times the feet between the static level and the pump intake, rounded to 3 figures. It assumes drawdown stays in proportion to the pumping rate, which wells often do not follow at higher flow, so it is an upper-end figure.
- Specific capacity (gpm/ft) applies to your test rate and time. At higher flow rates or longer runs, specific capacity often drops due to well friction and aquifer drawdown.
- Home flow targets come from Table 2 of Penn State Extension's Water System Planning: Estimating Water Needs (MWPS-14, 1992), which titles it minimum flow rates. Five bedroom and bathroom pairs have no listed value in Table 2.
- FHA and HUD loan rules follow 24 CFR 200.926d(f)(2)(i) (5 gpm for 4 hours on new homes). Existing homes follow HUD Handbook 4000.1 II.A.3.a.ii(N)(2) (3 gpm). These are published minimums, not a forecast of the well in a dry season.
- The estimate is flagged when half or more of the pumped water came from casing storage, when it exceeds 3 times the tested rate, when drawdown is under 5 ft, or when the readings are impossible. Readings are impossible when the pumping level is below the intake or the casing holds more drawn water than was pumped. A flagged estimate is left out of the Table 2 comparison.
- The pumping rate shows what the well supplied only if the pumping level had stopped falling by the end of the run. The calculator cannot check that from one reading. Water levels also move with the seasons: Penn State Extension notes that "a well that typically has 100 feet of water may have less than 20 feet of water storage during a drought."
What to do with the result
Compare the 4-hour column with 24 CFR 200.926d(f)(2)(i), which states 5.00 gpm over at least 4 hours for new homes. For existing homes, HUD Handbook 4000.1 II.A.3.a.ii(N)(2) states a continuous 3.00 gpm, and the 4-hour test is stated for new construction and shared wells. For new homes, only a test that pumped 5.00 gpm for 4 hours shows it, and an estimate does not. Then size your pump in the well pump head calculator.
Table 2 is titled "Minimum flow rates (GPM)", so it is a flow target and not a measured demand. Penn State Extension adds: "you may need to rely on water storage to meet peak demand periods." To size storage, take your day's projected use (400 gallons in the source's example) and compare it with the well's gpm × 120 minutes, the 2-hour peak. This page's own rough guide is the shortfall against the Table 2 flow times 120 minutes. A 42-gallon tank gives only about 8 gallons of drawdown between 20 psi and 40 psi. Check tank options in the pressure tank drawdown calculator, or add a 100-gallon-per-person holding tank (500 gallons for 5 people). If the estimate meets the flow but the test pumped less, run a longer test near that flow.
Check the margin above the pump intake, which is 50.0 ft in the default example. If the pumping level reached or passed the intake, recheck the levels and the intake depth before relying on the result. Penn State Extension says a low-water signal should stop the pump when the level reaches a critically low point. Check floor height losses in the water pressure elevation calculator and power bills in the well pump electricity cost calculator.
Sanitize and test the water after any well work. When you open a well cap, find your bleach dose in the well shock chlorination calculator. Check softener draw in the water softener size calculator, and test every 12 months for coliform bacteria, nitrates, total dissolved solids, and pH.
Frequently asked questions
What is a good well yield in gallons per minute for a house?
Penn State Extension suggests at least 6 gpm (360 gallons per hour) for most single-family homes. Its Table 2 lists 6 to 18 gpm by home size, such as 12 gpm for a 3-bedroom, 2-bathroom house. HUD Handbook 4000.1 says existing wells must deliver 3 gpm of continuous flow. 24 CFR 200.926d says a new home's system should be capable of 5 gpm over at least 4 hours (1,200 gallons).
Why is my refill rate lower than my pumping rate?
During the test, the pump draws on two sources: standing water in the casing and the rock. Once the pump stops, the water rises only as fast as the rock delivers. That inflow slows as the level climbs back toward the static level. The refill rate is the average over the minutes you watched, so it is not the yield. In the default example the pump ran at 10.00 gpm, while the refill averaged 2.84 gpm.
What does specific capacity tell me about a well?
Specific capacity is the pumping rate divided by drawdown, such as 10 gpm ÷ 30 ft = 0.333 gpm/ft. A higher number means the well yields more water for each foot of drawdown. If 10 gpm later causes 50 ft of drawdown (0.200 gpm/ft), specific capacity has fallen by 40%.
How much water is stored per foot in different well casing diameters?
By cylinder geometry, a 6-inch inside diameter pipe stores 1.469 gallons per foot of water column, and a 10-inch pipe stores 4.080 gallons per foot. Standard 4-inch, 8-inch, and 12-inch casings hold 0.653, 2.611, and 5.875 gallons per foot. A very wide casing stores far more: 24 inches holds 23.501 gal/ft. In Learn About Private Water Wells, the U.S. Environmental Protection Agency (EPA) says dug wells "have a large diameter, are shallow (approximately 10 to 30 feet deep) and are not cased continuously."
Can a 1 gpm well supply a family of four?
Often, when paired with storage. A 1 gpm well makes 1,440 gallons a day. It gives only 120 gallons in a 2-hour peak, so storage has to cover the peak. An intermediate holding tank sized to hold a full day's water use can then be slowly refilled overnight from the well.
What are the FHA well test standards for a mortgage?
Under 24 CFR 200.926d(f)(2)(i) and HUD Handbook 4000.1 II.A.3.a.ii(N)(2), a new home's well should be capable of 5 gpm for at least 4 hours (1,200 gallons). Existing wells must deliver at least 3 gpm. Under HUD Handbook 4000.1, the separate water-quality test must be collected and run by a disinterested third party. Its report must be no more than 180 days old at disbursement when a well test is required.
What happens if the pumping water level reaches the pump intake?
If drawdown brings the water to the pump intake (0 ft margin), the pump can pull air and lose prime. Penn State Extension says a cut-off switch should stop the pump before air or sediment is pulled into the system.
Sources
- USGS, Water Basics Glossary (page modified Jun 17, 2013)
- Penn State Extension, Water System Planning: Estimating Water Needs (page modified May 29, 2025)
- Penn State Extension, Using Low-Yielding Wells (page modified Sep 8, 2025)
- 24 CFR 200.926d, Construction requirements (GovInfo 2025 CFR) (2025 edition)
- HUD, Handbook 4000.1, FHA Single Family Housing Policy Handbook, Individual Water Supply Systems (updated Aug 12, 2026)
- EPA, Learn About Private Water Wells (page modified Sep 14, 2026)
- EPA, Protect Your Home's Water (page modified Feb 26, 2026)
More in Well, Water & Septic Calculators and Home Improvement Calculators.